Through our collaborative experience, more than 500 full time employees provide intelligent solutions in an extremely competitive market. Working in volatile, remote locations on super fast-track design-build projects and often in areas lacking a trained and educated work force requires us to be extremely flexible and adapt to a constantly changing work environment.

Our completed projects below will provide a sense of the breadth and quality of work we do.

Projects Completed

As professionals in this business for over five decades, we have been able to complete many projects successfully on time to the correct specification and vision set at the beginning and our enviable track record is proven by the many projects.  The list of the satisfied customers of Ghai Construction Limited is growing day by day and we are proud to say all our customers are content and satisfied with our well planned well executed projects. The following completed projects stand testimony to our ability to deliver what we promise.

Railway Siding – Power Sector
Wardha Power Company Private Limited Project:
Wardha Power Company Pvt. Ltd. Project

This is a work of construction of railway line feeding a thermal power plant with coal, for bulk handling for coal thermal power plants.

Project Client Value of Contract (In Lakh) Value of Work Done (In Lakh)

Construction of BG Railway siding including earthwork, bridges, P.way linking and supply of PSC sleepers/ P.way materials etc., for WPCPL's Thermal Power Project at Warora Dist. Chandrapur in Maharashtra Warora

Wardha Power Company
Private Ltd.
Hyderabad
1980
2119
 
Subways / Road Under Bridges
Superintending Engineer, M.S.R.D.C Ltd,Nagpur Project:
Superintending Engineer,M.S.R.D.C Ltd,Nagpur Project

Due to congestion in cities construction of Subways / Road Under Bridges by using Box Pushing Technology has become a boon to the construction industry. Without disrupting the traffic or reducing the passage for traffic, a Subway can be conveniently constructed. This technology is mainly used to construct Subways below the railway tack wherever required, without disruption of railway traffic.  
Some works done under this category are as follows.

 
Project Client Value of Contract (In Lakh) Value of Work Done (In Lakh)

Design and Construction of Road Under Bridge 9.5 x 4.5 meter including approaches near Narendra Nagar, Nagpur at Railway Km.831/26-28 of Central Railway on Nagpur-Wardha Section by Box Pushing Technology.

Superintending Engineer,
M.S.R.D.C Ltd,
Nagpur.
740
717
 
Subways / Road Under Bridges
General Manager (P) RITES Ltd, Nagpur Project:
General Manager (P) RITES Ltd, Nagpur project Project

Due to congestion in cities construction of Subways / Road Under Bridges by using Box Pushing Technology has become a boon to the construction industry. Without disrupting the traffic or reducing the passage for traffic, a Subway can be conveniently constructed. This technology is mainly used to construct Subways below the railway tack wherever required, without disruption of railway traffic.

 

 

 
Project Client Value of Contract (In Lakh) Value of Work Done (In Lakh)

Construction of Road Under Bridge by Box pushing technique across NG Railwauy Track on Raipur-Dhamtari Rilway Line and BG Railway track on Mumbai-Howrah Railway Line at Gudiyari, Raipur for M/s. PWD, Raipur.

General Manager (P) RITES Ltd,
Nagpur.
1016
1064
 
Storm Water Management/ Drainage
Executive Engineer Public Works Department Bhayandar Project:
Executive Engineer Public Works Department Bhayandar Project

The city of Bhayandar (Suburb of Mumbai) used to perpetually get flooded every monsoon leading to immense water logging and disruption of lives of the residents of that area.
The reason for this flooding was the higher elevation of the railway tracks compared to the rest of the city, which was running through Bhayandar dividing the same into East and West Bhainder. This problem was studied and analyzed by us and the work was executed accordingly and suitable number of openings were made at two locations by Micro Tunneling to provide storm water drains as such resulting in there being no water logging thereafter.    
The following project was done keeping in mind storm water management:

 
Project Client Value of Contract (In Lakh) Value of Work Done (In Lakh)

Design, Construction of storm water drains havinginternal Diameter of 1800mm across Railway tracks,connection with existing drains and pump house with provision of sludge pumps between Mira Road and Bhayandar Railway Station. 

Executive Engineer Public Works Department,
Bhayandar
1456
1412
 
Drainage
Central Railway, Mumbai Project:
Central Railway, Mumbai Project

   
Project Client Value of Contract (In Lakh) Value of Work Done (In Lakh)

Construction of additional opening for widening of Brahmanwada Nallah between KM 15/36-37 between Kurla – Vidhyavihar station in Mumbai Division on Central Railway. 

Central Railway, Mumbai
299
285
 
Water Pipelines
General Manager (P) RITES LTD., Kolkata Project:
General Manager(P)RITES LTD.,Kolkata Project

The work of laying of the pipeline below a railway yard comprising of boat canal, being one of the most prestigious projects with regard to water supply.
The pipeline was laid below the running boat canal and railway yard by Micro Tunneling in a single drive of 150 meters in a water logged ground condition.

 
Project Client Value of Contract (In Lakh) Value of Work Done (In Lakh)

Laying of 1800 mm internal dia RCC pipes below the Eastern Railway tracks at Majerhat by pipe jacking technique & insertion of 1400 mm outer dia MS pipewithin the RCC pipes.

General Manager (P) RITES LTD.,
Kolkata
742
693
 
Track Rehabilitation
Jt.Gen. Manager (P) RITES LTD. Secundrabad Project:
Jt.Gen. Manager (P) RITES LTD. Secundrabad Project

The Railways are one of the most economical means for mass transport of goods and passengers in any country around the world and are being used for many years now.
It has now reached a stage where the system needs to refurbished/ rehabilitated. We have executed many such contracts which are as follows:

 
Project Client Value of Contract (In Lakh) Value of Work Done (In Lakh)

Earth work in formation and supply of PSC sleepers, CMS Points and crossings. P.Way track fittings, ballst and linking of track for expansion of railway siding of Rayalaseema Thermal Power Plant, Stage-II at V.V.Reddy Nagar for M/s APGENCO.

Jt.Gen. Manager (P) RITES LTD.
Secundrabad
614
576
 
Track Rehabilitation
South Eastern Coalfields Limited Project:
Project Client Value of Contract (In Lakh) Value of Work Done (In Lakh)

Laying & Linking of railway track including supply of ballast & other P.Way materials in connection with upgradation of track between Junadih take-off to Dipika Take-off point at Dipika, Dist-Korba, C.G.

South Eastern Coalfields Limited
680
668
 
Projects in Hand

Construction of 10M wide subway for pedestrians and light vehicles at Jessal Park (North End of Bhayander Station) at Km. 43/5A-6A below the platform and running track of sub-urban section of Mumbai Division of Western Railway.

Introduction:
The East and West of Bhaindar City is connected by only one flyover which is about 3 Kms. away from the Railway Station involving a round trip of 6 Kms. to go to West Side of the Railway Station from East. A Subway was proposed at Bhainder Station on Virar End for Light Motor Vehicle and Pedestrian crossing as construction of a flyover was not possible due to congested market area with high rise buildings.

Tender was invited by Mira Bhaindar Municipal Corporation for seven times for construction of Subway by Box-Jacking Method with no participation by any agency.

M/s RITES Limited investigated reasons for non participation & found out that the soil is very weak and normal box jacking is not possible.  As moment the box section enters the embankment the initial settlement will be very high resulting in sinking of the Box unit due to vey weak soil(N=0 to 2). The same was reconfirmed by IIT Mumbai with a fresh soil investigation.
Eighth call was called by MBMC for the construction of subway with Contractor’s Methodology. The method of Pipe Arch was proposed by M/s. Ghai Construction Limited, which was finally approved by the Western Railways.

Financial Impact:
The cost of the Subway is higher as compared to a similar subway in normal ground condition by Box Jacking Method. But the use of this technology is making the construction of the Subway possible which is been pending for the past decade.

Method of Construction:
Length of Subway – 73m Crossing Three platforms and 7 nos of Railway tracks

Western Railway- Bhayendar Project Project
 
Specialization

Earth works, Road Over/Fly Over/Road Under/Bridges, Rehabilitation of Bridges, Construction of Bridges by Pipe/Box Pushing Technique, Construction of Tunnels, Roads, P. Way works and Private Railway Sidings on Turn Key Basis.

Technology

At GCL, we work on various modern techniques like Microtunneling, Trenchless technology or Box pushing technology to mention a few to achieve the best possible result to achieve the ultimate goal with precision and timely solution. Here are some details about the technologies practised which explains their functionality.

Micro TunnelingMicro Tunneling
As the name implies, micro tunneling is a digging technique used to construct small tunnels. These small diameter tunnels make it impossible to have an operator in the machine itself.
In most microtunneling operations the pipe is inserted from the entry and pushed behind the machine. This is a process often called Pipe Jacking. As the machine advances, more tunnel liner is pushed from the entrance. Thus, the speed of the advancing machine is controlled by the speed at which the pipe is inserted into the entrance.

Trenchless Technology
This a type of subsurface construction work that requires few trenches or no continuous trenches. It is a rapidly growing sector of the construction and civil engineering industry. It can be defined as "a family of methods, materials, and equipment capable of being used for the installation of new or replacement or rehabilitation of existing underground infrastructure with minimal disruption to surface traffic, business, and other activities."
The difference between trenchless and other subsurface construction techniques depends upon the size of the passage under construction.
The method requires considering soil characteristics and the loads applied to the surface. In cases where the soil is sandy, the water table is at shallow depth, or heavy loads like that of urban traffic are expected, the depth of excavation has to be at a depth such that the pressure of the load on the surface does not affect the bore, otherwise there is danger of surface caving in.

Box Pushing TechniqueBox Pushing
Box jacking, also known as Tunnel Jacking, involves the advancement of a site cast rectangular or other shaped sections using high capacity hydraulic jacks. The structure to be installed is constructed, normally in reinforced concrete, on a launch pad at site adjacent to where it has to be installed. It is then thrust forward horizontally using advance support, open shield and jacking technology with excavation taking place from inside the box. This is frequently used where an existing road or rail track is on an embankment and space exists for the structure to be cast at the side.
The main benefit of this approach is that it is non disruptive and non-intrusive. Tunnel jacking can install the final structure in one go, it also allows the above infrastructure to remain “live” and active during the work.

 

 
Home
About Us
Projects
Career Contact Us Awards
 
 
 
 
 
 
  Management Overview Areas of Business Our Team Our Strategy Our Clients Our Vision Our Founders Projects Projects Completed Projects in Hand Specialization Technology     Award
         

GCL- Ghai Construction Limited © 2012. All Rights Reserved.

Designed and developed by Uniqfundas